1.Main Specifications and Equipments
2.Detailed
3.Main components
4.Service
1. Are you a factory or trading company?
A:We are a manufacturer with export license.
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3,What’s your usual practice?
TT, Western Union in advance. (Specially for air shipment or small amount.)
4,How long is the delivery time?
For standard machines, it would be 7 days; For non-standard machines and customized machines according to clients
specific requirements, it would be 30 days.
5, Do You Arrange Shipment For The Machines?
Yes, dear esteemed customers, for FOB or CIF price, we will arrange shipment for you. For EXW price, clients need to arrange shipment by themselves or their agents.
5.Advantage
1. Gb channel steel, the whole machine is 10% heavier than similar equipment, reducing the stress when the machine moves at high speed. Bag making more accurate.
2. High-quality aluminum roller, reducing the resistance in the transmission of the cloth, so that the cloth to maintain a constant tension.
3. Imported yade polite cylinder and pneumatic components. Durable and stable.
4. Four ultrasonic waves can be independently controlled, saving 5% of energy consumption and extending service life.
5 hot handle and bag can be mutual control, a key speed, save operating time.Ultrasonic welding head made of high quality alloy steel is durable.
Optional machine unching equipment for U-cut bag
Can make the bag as follow one time
Associate machine